The Following Building Permit Fees are EFFECTIVE AS OF APRIL 16, 2012
 Type of Service  Fee
One and Two Family Structures
New Construction $2 per square foot of living space & $0.75 per square foot of habitable basement (ancillary mechanical, electrical and plumbing included)
Additions & Renovation to Existing Structures 1.5% of construction cost; $50 Minimum
(includes ancillary mechanical, electrical and plumbing)
Commercial Structures (Comercial, Institutional, Multi-family, Industrial)
Commercial projects - New construction, additions, buildouts, etc. 1.5% of construction cost up to $1,000,000;
1 % of cost for next $4,000,000; and
0.5% of cost over $5,000,000;
Plan Review Deposit  
One & Two Family
New Construction
$4,000 Escrow (to cover consulting engineer fees, plan reviews, inspections, correspondence, site visits, etc.)
NOTE: In the event any funds remain, balance will be reunded at time of Final Certificate of Occupancy 
Commercial Projects $500 minimum; projects over $175,000 require deposit of 0.003% of total construction costs
(example: $200,000 cost x  .003 = $600 deposit)
Additions & Renovations to Existing One & Two Family Structures
Engineering Escrow (if required)
$300 

$1,000
 All other projects $100 
 Demolition  
Commercial Structures $1,000 
Residential Structures $500 
Accessory Structures $50 
Other Permits  
Minimum Permit Fee 1.5% of cost; $50 minimum 
Mechanical (A/C units, furnace, Water Heaters, Fire Dampers)  1.5% of cost, $50 minimum 
Electrical     1.5% of cost, $50 minimum 
Plumbing Supply, Drain, Waste & Vent   1.5% of cost, $50 minimum 
Swimming Pools 1.5% of cost, $100 minimum 
Signs, Illuminated  $125 
Signs, Non-Illuminated  $100 
Elevators  $100 1st thru 3rd floors;
$20 each additional floor
PLUS Consultant Review Fee 
Engineering   
Consulting Engineer Fees (includes hourly rate for plan review, correspondence, meetings, site visits, inspections, etc.) Varies (Outside Consultant Fees PLUS 10%) 
Inspection Services   
Re-inspection   $50
Other Administrative   
Certificate of Occupancy  $50 
Work without a permit  Double Permit Fee 
Water Connection Fees   *See Schedule "A"
Contractor Registration  *See "Contractor's Annual Registration and Bond Requirements" 
Zoning Applications   
Administrative Adjustments  $100 
Consolidation/Resubdivision  $50 
Design Review Permit  $200 Filing Fee, non-refundable 
Planned Development  $3,000 Escrow 
Special Use Permit  $1,500 Escrow 
Vacation of Public Right-of-Way $200 non-refundable deposit 
Variations  $500 
Variations for Garage Height  $500 
Zoning Amendments  $1,500 Escrow 
Zoning Appeals  $1,500 Escrow 
Zoning Interpretation  $50 

SCHEDULE "A"

 METER COSTS
 Size Type (Sensus) Meter Cost Smart Point
Meter Copperhorn
Fittings  Inspection/
Installation Fee
 
Total Meter
Cost
 
5/8" iPerl
 117.00  125.00 111.00
 35.00 100.00 488.00
3/4"  iPerl
134.00 125.00  111.00 35.00 100.00 505.00
1" iperl
172.00 125.00  111.00
 100.00  508.00
1 1/2" C2 Omni 975.00 125.00    60.00  100.00  1,260.00
2" C2 Omni  1,200.00 125.00    72.00  100.00  1,497.00
3" C2 Omni  1,520.00 125.00    184.00  100.00  1,929.00
4" C2 Omni  2,640.00 125.00    205.00  100.00  3,070.00
6" C2 Omnis  4,560.00 125.00    345.00  100.00  5,130.00
*Water meter installation to be performed by Public Works for 5/8", 3/4" and 1"
*Water meter installation to be performed by Contractor for 1 1/2" and larger

 WATER TAP COSTS
Size  Materials Provided by Public Works  Total Tapping Fee 
1" Corporation, B-Box, Roundway  800.00 
1 1/2"  Corporation, Saddle, B-Box, Roundway  800.00 
2"  Corporation, Saddle, B-Box, Roundway  800.00 
3"  Pressure Tap, Materials provided by contractor  800.00 
4"  Pressure Tap, Materials provided by contractor  800.00 
6"  Pressure Tap, Materials provided by contractor  800.00 
*Water taps to be performed by contractor and inspected by Public Works
*Inspection to be performed at the following intervals:
                                       1.  After excavation of roadway and exposure of water main
                                       2.  During tapping of water main
                                       3.  After backfilling        

*Sewer Connection Fee $800.00